Review our latest case studies
Resi Building Site
The Construction Site Manager needed to verify the amount of fill being removed from site to knowin real time what the cost will be and the amount of machines and trucks he will need to completeworks.Traditionally, we would use manual methods, such as tape measures and visual estimations whichhave been time-consuming, prone to errors, and lack accuracy. So, we used the LiDARx3 APP to measure the stockpiled material. The stockpile volume wascalculated and generated a detailed PDF reports containing accurate measurements and relevantstockpile data. This saves us time compared to… Continue reading Resi Building Site
Read More